Retired Section Swansea Docks |
|
|
|
|
The digger in the foreground is working on the edge of the Prince of Wales Dry Dock |
|
|
|
|
|
|
|
|
|
|
Another view of the basin showing the land where the entrance channel will be made. |
|
|
|
|
|
The end wall of the Prince of Wales Dry Dock nearest to the Dock. |
|
|
|
|
|
The Dry Dock cleared of all the back fill which took place over many years. The walls are still in remarkable condition |
|
|
|
|
|
A new sluice built to allow the level of the water to be controlled. |
|
|
|
|
|
This picture shows the position of the old lock gates |
|
|
|
|
|
In the centre is the discharge from the redundant hydro electric generator. |
|
|
|
|
|
|