|
Retired Section Swansea Docks |
|
|
|
|
|
Pile stockyard with overhead travelling gantry. |
|
|
|
|
|
|
|
The three photos above show the building of a suspended quay for a coal hoist. |
|
|
|
Construction of a reinforced concrete dock wall. |
|
|
|
Temporary rail bridge which could be raised to allow the passage of barges loaded with stone. |
|
|
|
Stone cutting and dressing area. |
|
|
|
|
|
The two photos above show the building of a sluice tunnel. |
|
|
|
|
|
The above two photos show the laying of the concrete floor of the lock. |
|
|
|
Inspection of the
floor of the Kings Dock Lock. |